Migrating to i-doIT: A Step-by-Step Guide for IT TeamsMigrating to i-doIT (an open-source IT documentation and CMDB solution) can significantly improve how your organization documents assets, tracks relationships, and supports IT service management. This guide walks IT teams through a practical, phased migration process — from planning and preparation to validation and handoff — with concrete steps, checklists, common pitfalls, and recommendations for a smooth transition.
Why migrate to i-doIT?
- Centralized documentation: i-doIT provides a structured CMDB to store devices, software, locations, and relationships in one place.
- Flexibility: Supports custom object types, attributes, and relations, enabling adaptation to your environment.
- Integrations: Connects with monitoring, ticketing, AD/LDAP and other tools.
- Cost-efficiency: Open-source edition reduces licensing costs while the enterprise edition adds support and extra features.
Phase 1 — Pre-migration planning
1. Define goals and scope
- List specific problems you want to solve (spin up improved incident resolution, consolidate scattered documentation, reduce manual audits).
- Determine scope: full CMDB replace, partial migration (only hardware), or new system alongside legacy tools (phased approach).
2. Stakeholders and team
- Assign roles: Project sponsor, Migration lead, Data owners (per asset type), QA/tester, Integration engineer, Trainers.
- Ensure representation from infrastructure, security, applications, service desk, and asset management.
3. Inventory and data audit
- Compile sources: spreadsheets, existing CMDBs, monitoring systems, Active Directory, CSV exports, procurement records, and network scans.
- Perform a data quality assessment: completeness, accuracy, duplicate records, naming inconsistencies, and outdated entries.
4. Define data model & naming conventions
- Map source fields to i-doIT object types and attributes. Consider custom object types where needed.
- Establish naming standards, unique identifiers (serial numbers, asset tags), and canonical location formats.
- Decide on relationship models (which device types link to which services, racks, network segments).
5. Migration approach and timeline
- Choose between one-time big-bang or incremental migration. For large organizations, incremental is recommended.
- Create a timeline with milestones: discovery complete, mapping finished, first import, validation window, cutover date, post-migration review.
Phase 2 — Preparation and tooling
1. Test environment setup
- Install i-doIT in a staging environment that mirrors production in version and integrations.
- Configure base settings (languages, user roles, groups, backup schedules).
- If using i-doIT enterprise features, ensure staging license covers them.
2. Export and normalize data
- Extract data from each source in machine-readable formats (CSV, JSON, XML).
- Normalize fields: date formats, serial number patterns, standardized OS names, IP address formatting.
- De-duplicate: use unique keys (MAC, serial, asset tag) to identify and merge duplicates.
3. Create mapping specification
- Build a mapping document showing each source field -> i-doIT object type.attribute. Include transformation rules (e.g., concatenate fields, parse location strings).
- Define default values for missing required attributes.
- Specify how relationships will be derived (e.g., map IP subnets to network segments, link servers to racks via rack position field).
4. Select/import tools
- i-doIT supports imports via CSV and has an API; decide whether to use built-in import, custom scripts, or ETL tools (Python scripts, PowerShell, or ETL platforms).
- For repeated imports or synchronization, develop scripts that call i-doIT’s REST API or use scheduled CSV imports.
Phase 3 — First import (pilot)
1. Choose pilot dataset
- Pick a small, representative subset: one department, one data center, or one asset class (e.g., servers).
- This reduces risk and allows process refinement.
2. Execute the import
- Back up staging i-doIT DB before import.
- Run the import script or CSV upload following the mapping spec.
- Document errors and warnings.
3. Validate results
- Verify object counts, spot-check attributes, and confirm relationships.
- Run practical checks: Can you find a device by serial number? Are rack positions and IPs linked correctly?
- Record issues and adjust mappings and normalization rules.
Phase 4 — Full migration
1. Iterate over asset classes
- Migrate groups in planned order (e.g., network devices → servers → storage → applications → users/locations).
- For each class: export, normalize, map, import, validate.
2. Handling live change and synchronization
- For long migrations, implement delta detection: capture changes made in source systems since the last export to avoid stale data.
- Use scheduled syncs or an integration layer to keep sources aligned during migration.
3. Relationship and service mapping
- After core assets are imported, import higher-level constructs: services, SLAs, CI relationships, and configuration items that depend on multiple objects.
- Validate service impact maps and topology views.
4. Integrations
- Re-establish integrations (monitoring, ticketing, LDAP/AD, discovery tools).
- Test authentication (SSO/LDAP), read/write permissions, webhooks, and API connectivity.
Phase 5 — Validation, QA, and user acceptance
1. Functional validation
- Create test cases that mirror real operations: search scenarios, impact analyses, change planning tasks, and report generation.
- Ensure role-based access works and audit logs are recorded.
2. Data quality checks
- Run automated checks for orphaned entries, missing required fields, inconsistent relationships, and duplicate objects.
- Use SQL queries or API checks to verify totals against source systems.
3. User acceptance testing (UAT)
- Involve service desk and operations staff to validate usability and correctness.
- Collect feedback, classify issues by severity, and fix critical items before cutover.
Phase 6 — Cutover and go-live
1. Cutover approach
- For incremental migration: flip traffic and processes to i-doIT in stages (e.g., one team at a time).
- For big-bang: schedule a maintenance window, put legacy systems into read-only (if possible), perform final sync, then enable i-doIT as the authoritative source.
2. Communication and training
- Communicate cutover schedule, expected changes, and support channels.
- Provide quick reference guides and role-specific training (service desk, asset managers, admins).
3. Monitoring and immediate support
- Monitor logs, integration endpoints, and user-reported issues closely for the first 2–4 weeks.
- Keep a rollback plan ready: restore backups or revert to read-only legacy if critical failures occur.
Phase 7 — Post-migration operations
1. Ongoing governance
- Establish ownership and stewardship processes: who updates which attributes, SLA for data changes, and periodic audits.
- Create a change-control process to manage schema or attribute changes in i-doIT.
2. Continuous synchronization
- For authoritative source systems, set up scheduled syncs or real-time integrations to keep i-doIT current (examples: discovery tool pushes, AD sync for users, procurement system for asset lifecycle).
3. Reporting and improvement
- Build dashboards and reports that deliver value: asset lifecycle, compliance posture, license usage, and impact analysis.
- Schedule quarterly data clean-ups and annual model reviews.
Common pitfalls and how to avoid them
- Poor data quality: invest time in cleaning and normalizing sources before import.
- Missing stakeholder buy-in: include end-users early and demonstrate quick wins.
- Overcomplicated data model: start with a practical model and add complexity only when needed.
- Ignoring integrations: plan and test integrations early, especially authentication and monitoring.
- No rollback plan: always keep backups and a clear contingency process.
Checklist — Quick migration runbook
- [ ] Define scope and goals
- [ ] Assign roles and stakeholders
- [ ] Inventory and assess source data quality
- [ ] Design i-doIT data model and naming conventions
- [ ] Set up staging i-doIT environment
- [ ] Create mapping spec and normalization scripts
- [ ] Run pilot import and validate
- [ ] Iterate and import remaining asset classes
- [ ] Re-establish and test integrations (LDAP, monitoring, ticketing)
- [ ] Conduct UAT and finalize cutover plan
- [ ] Execute cutover and provide training/support
- [ ] Implement ongoing governance and sync processes
Example: simple CSV-to-i-doIT import workflow (conceptual)
- Export assets from source to CSV with fields: asset_tag, serial, hostname, ip, location, owner, model, os.
- Run normalization script (Python/PowerShell) to standardize OS names, fill missing locations, and dedupe by serial.
- Generate import CSV matching i-doIT columns.
- Upload to i-doIT import tool or call REST API to create/update objects.
- Verify counts and spot-check entries.
Final notes
Migrating to i-doIT is primarily a data and process exercise rather than a pure technology swap. The most successful migrations focus on cleaning and modeling data, incremental validation, stakeholder engagement, and building reliable integrations. With careful planning and staged execution, i-doIT can become a single source of truth that improves decision-making, reduces incidents, and streamlines IT operations.