Top 10 Features That Make i-doIT a Must-Have for CMDBs

Migrating to i-doIT: A Step-by-Step Guide for IT TeamsMigrating to i-doIT (an open-source IT documentation and CMDB solution) can significantly improve how your organization documents assets, tracks relationships, and supports IT service management. This guide walks IT teams through a practical, phased migration process — from planning and preparation to validation and handoff — with concrete steps, checklists, common pitfalls, and recommendations for a smooth transition.


Why migrate to i-doIT?

  • Centralized documentation: i-doIT provides a structured CMDB to store devices, software, locations, and relationships in one place.
  • Flexibility: Supports custom object types, attributes, and relations, enabling adaptation to your environment.
  • Integrations: Connects with monitoring, ticketing, AD/LDAP and other tools.
  • Cost-efficiency: Open-source edition reduces licensing costs while the enterprise edition adds support and extra features.

Phase 1 — Pre-migration planning

1. Define goals and scope

  • List specific problems you want to solve (spin up improved incident resolution, consolidate scattered documentation, reduce manual audits).
  • Determine scope: full CMDB replace, partial migration (only hardware), or new system alongside legacy tools (phased approach).

2. Stakeholders and team

  • Assign roles: Project sponsor, Migration lead, Data owners (per asset type), QA/tester, Integration engineer, Trainers.
  • Ensure representation from infrastructure, security, applications, service desk, and asset management.

3. Inventory and data audit

  • Compile sources: spreadsheets, existing CMDBs, monitoring systems, Active Directory, CSV exports, procurement records, and network scans.
  • Perform a data quality assessment: completeness, accuracy, duplicate records, naming inconsistencies, and outdated entries.

4. Define data model & naming conventions

  • Map source fields to i-doIT object types and attributes. Consider custom object types where needed.
  • Establish naming standards, unique identifiers (serial numbers, asset tags), and canonical location formats.
  • Decide on relationship models (which device types link to which services, racks, network segments).

5. Migration approach and timeline

  • Choose between one-time big-bang or incremental migration. For large organizations, incremental is recommended.
  • Create a timeline with milestones: discovery complete, mapping finished, first import, validation window, cutover date, post-migration review.

Phase 2 — Preparation and tooling

1. Test environment setup

  • Install i-doIT in a staging environment that mirrors production in version and integrations.
  • Configure base settings (languages, user roles, groups, backup schedules).
  • If using i-doIT enterprise features, ensure staging license covers them.

2. Export and normalize data

  • Extract data from each source in machine-readable formats (CSV, JSON, XML).
  • Normalize fields: date formats, serial number patterns, standardized OS names, IP address formatting.
  • De-duplicate: use unique keys (MAC, serial, asset tag) to identify and merge duplicates.

3. Create mapping specification

  • Build a mapping document showing each source field -> i-doIT object type.attribute. Include transformation rules (e.g., concatenate fields, parse location strings).
  • Define default values for missing required attributes.
  • Specify how relationships will be derived (e.g., map IP subnets to network segments, link servers to racks via rack position field).

4. Select/import tools

  • i-doIT supports imports via CSV and has an API; decide whether to use built-in import, custom scripts, or ETL tools (Python scripts, PowerShell, or ETL platforms).
  • For repeated imports or synchronization, develop scripts that call i-doIT’s REST API or use scheduled CSV imports.

Phase 3 — First import (pilot)

1. Choose pilot dataset

  • Pick a small, representative subset: one department, one data center, or one asset class (e.g., servers).
  • This reduces risk and allows process refinement.

2. Execute the import

  • Back up staging i-doIT DB before import.
  • Run the import script or CSV upload following the mapping spec.
  • Document errors and warnings.

3. Validate results

  • Verify object counts, spot-check attributes, and confirm relationships.
  • Run practical checks: Can you find a device by serial number? Are rack positions and IPs linked correctly?
  • Record issues and adjust mappings and normalization rules.

Phase 4 — Full migration

1. Iterate over asset classes

  • Migrate groups in planned order (e.g., network devices → servers → storage → applications → users/locations).
  • For each class: export, normalize, map, import, validate.

2. Handling live change and synchronization

  • For long migrations, implement delta detection: capture changes made in source systems since the last export to avoid stale data.
  • Use scheduled syncs or an integration layer to keep sources aligned during migration.

3. Relationship and service mapping

  • After core assets are imported, import higher-level constructs: services, SLAs, CI relationships, and configuration items that depend on multiple objects.
  • Validate service impact maps and topology views.

4. Integrations

  • Re-establish integrations (monitoring, ticketing, LDAP/AD, discovery tools).
  • Test authentication (SSO/LDAP), read/write permissions, webhooks, and API connectivity.

Phase 5 — Validation, QA, and user acceptance

1. Functional validation

  • Create test cases that mirror real operations: search scenarios, impact analyses, change planning tasks, and report generation.
  • Ensure role-based access works and audit logs are recorded.

2. Data quality checks

  • Run automated checks for orphaned entries, missing required fields, inconsistent relationships, and duplicate objects.
  • Use SQL queries or API checks to verify totals against source systems.

3. User acceptance testing (UAT)

  • Involve service desk and operations staff to validate usability and correctness.
  • Collect feedback, classify issues by severity, and fix critical items before cutover.

Phase 6 — Cutover and go-live

1. Cutover approach

  • For incremental migration: flip traffic and processes to i-doIT in stages (e.g., one team at a time).
  • For big-bang: schedule a maintenance window, put legacy systems into read-only (if possible), perform final sync, then enable i-doIT as the authoritative source.

2. Communication and training

  • Communicate cutover schedule, expected changes, and support channels.
  • Provide quick reference guides and role-specific training (service desk, asset managers, admins).

3. Monitoring and immediate support

  • Monitor logs, integration endpoints, and user-reported issues closely for the first 2–4 weeks.
  • Keep a rollback plan ready: restore backups or revert to read-only legacy if critical failures occur.

Phase 7 — Post-migration operations

1. Ongoing governance

  • Establish ownership and stewardship processes: who updates which attributes, SLA for data changes, and periodic audits.
  • Create a change-control process to manage schema or attribute changes in i-doIT.

2. Continuous synchronization

  • For authoritative source systems, set up scheduled syncs or real-time integrations to keep i-doIT current (examples: discovery tool pushes, AD sync for users, procurement system for asset lifecycle).

3. Reporting and improvement

  • Build dashboards and reports that deliver value: asset lifecycle, compliance posture, license usage, and impact analysis.
  • Schedule quarterly data clean-ups and annual model reviews.

Common pitfalls and how to avoid them

  • Poor data quality: invest time in cleaning and normalizing sources before import.
  • Missing stakeholder buy-in: include end-users early and demonstrate quick wins.
  • Overcomplicated data model: start with a practical model and add complexity only when needed.
  • Ignoring integrations: plan and test integrations early, especially authentication and monitoring.
  • No rollback plan: always keep backups and a clear contingency process.

Checklist — Quick migration runbook

  • [ ] Define scope and goals
  • [ ] Assign roles and stakeholders
  • [ ] Inventory and assess source data quality
  • [ ] Design i-doIT data model and naming conventions
  • [ ] Set up staging i-doIT environment
  • [ ] Create mapping spec and normalization scripts
  • [ ] Run pilot import and validate
  • [ ] Iterate and import remaining asset classes
  • [ ] Re-establish and test integrations (LDAP, monitoring, ticketing)
  • [ ] Conduct UAT and finalize cutover plan
  • [ ] Execute cutover and provide training/support
  • [ ] Implement ongoing governance and sync processes

Example: simple CSV-to-i-doIT import workflow (conceptual)

  1. Export assets from source to CSV with fields: asset_tag, serial, hostname, ip, location, owner, model, os.
  2. Run normalization script (Python/PowerShell) to standardize OS names, fill missing locations, and dedupe by serial.
  3. Generate import CSV matching i-doIT columns.
  4. Upload to i-doIT import tool or call REST API to create/update objects.
  5. Verify counts and spot-check entries.

Final notes

Migrating to i-doIT is primarily a data and process exercise rather than a pure technology swap. The most successful migrations focus on cleaning and modeling data, incremental validation, stakeholder engagement, and building reliable integrations. With careful planning and staged execution, i-doIT can become a single source of truth that improves decision-making, reduces incidents, and streamlines IT operations.